景兴
01 3
Huizhou tipo bay project
  As a demonstration site of national green standardization, shengjing financial square project has taken scientific and technological innovation as the first driving force of engineering construction since the beginning of construction, and it has adopted new mold and frame technology, BIM technology, intelligent construction site, virtual reality VR and other dizzying technologies.
The project also puts forward the idea of the "site" sponge, by laying permeable brick, the roof rainwater harvesting, enhance the capacity of the ground water, water storage, and with the setting of underground water storage module, rainwater collection tube and automatic cleaning filter to purify the rainwater collection and use of fully, finally make site form "don't rain water, rain waterlogging, water not black smelly, summer is not hot".
"As if experiencing the construction process in person, even the craft can clearly and carefully watch, it is simply a virtual and real through, too realistic. On May 2, the reporter saw at the construction site of shengjing financial square in shenyang that the project designer was using VR technology to reveal the 3d technology to the on-site technicians. The VR visualization technology used in this disclosure is called "bim-vr", which is a combination of VR(virtual reality) and BIM(building information model). When the two meet, a "real" virtual world enters the construction site.
  Shenyang shengjing financial plaza project in the volume, scale, efficiency, quality, technology, innovation and impact on the industry rarely, is a truly great project!

Covers an area of

71600000
m2

Construction area of

112800000
m2
return